Excavation...         
The soils behind the abutment have been removed to allow repairs to the backwall. The backwall (visible in the extreme bottom center of the photo) is located on top of the abutment and protects the end of the bridge from ballast and soil erosion. Note fully installed piles and steel lagging to maintain the existing track structure for Track 1.
Date: 9/13/2007 Location: Plainfield, NJ   Map Show Plainfield on a rail map Views: 186 Collection Of:   Dave Abeles
Author:  David Abeles
Excavation...
Picture Categories: This picture is part of album:  So, you want to replace a railroad bridge...
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=878278