Here we see one of the electrical contractor's employees preparing the wiring for the eventual arrival of the derail machine for Track 2 at the east end. If memory serves, I *think* this derail may have been re-positioned later to the opposite rail. All the derail equipment is bi-directional with the exception of the connecting rods - they must be ordered in near rail or far rail lengths. Note: The large gray wire strung along the tie is a grounding conductor and has nothing to do with the derail wiring. |
Date:
12/14/2007 |
Location:
Morrisville, PA Map ![Show Morrisville on a rail map](/images/map_us.gif) |
Views:
155 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Christopher Smith |
|
Author: Christopher Smith
|
![NJT Morrisville S&I - photo 31 of 50](http://s3.amazonaws.com/rrpa_photos/125660/31c%20pics1%20009.jpg) |
Picture Categories: |
This picture is part of album: NJT Morrisville Service & Inspection (S&I) facility |