CSX 6512 and 2551 (2)         
Yard job Y290-16 has paused under the eastbound signal bridge at Sodem. This is now the pairing used in the daily switching activities. But that can change as soon as something breaks down.
Date: 7/16/2015 Location: Connellsville, PA Views: 309 Collection Of:   Curt Beal
Locomotives: CSX 6512(GP40-3) CSX 2551(GP38-2)    Author:  Curt Beal
CSX 6512 and 2551 (2)
Picture Categories: Roster,Signal This picture is part of album:  CSX in Connellsville Area 2015 Set
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4247666