This photo is from the Dalbow Rd crossing. I looked on ATCS, and it shows the current length at 6860 ft. So this should be over 7000 ft when they are finished. |
Date:
3/10/2015 |
Location:
gibbs siding, MO |
Views:
201 |
Collection Of:
Butch Getz |
|
Author: Butch Getz
|
|
Picture Categories: Signal,Track |
This picture is part of album: Gibbs siding extension on the BNSF Hannibal sub |