Because the PANAM was the first car that was put on the iron a lot problem occured which were worked out to help the operation go smoother for the last 2 cars. The lowered MW worker has gegun to make the first cut on the roof |
Date:
4/4/2006 |
Location:
Bangor, ME Map |
Views:
770 |
Collection Of:
Rod Bushway |
Rolling Stock: |
Author: Rod Bushway
|
|
Picture Categories: RollingStock |
This picture is part of album: Derailments in Maine-Guilford |